# BMC Boot Ready
|
||
|
|
|
||
|
|
Author: Andrew Geissler (geissonator)
|
||
|
|
|
||
|
|
Other contributors:
|
||
|
|
|
||
|
|
Created: May 12, 2022
|
||
|
|
|
||
|
|
## Problem Description
|
||
|
|
|
||
|
|
There are services which run on the BMC which are required for the BIOS (host
|
||
|
|
firmware) to power on and boot the system. The goal of this design is to define
|
||
|
|
a mechanism to ensure these dependencies are met before a power on or boot is
|
||
|
|
started.
|
||
|
|
|
||
|
|
For example, on some system, you can not power on the chassis until the VPD has
|
||
|
|
been collected from the VRM's by the BMC to determine their characteristics. On
|
||
|
|
other systems, the BIOS service is needed so the host firmware can look for any
|
||
|
|
overrides.
|
||
|
|
|
||
|
|
Currently, OpenBMC has an undefined behavior in this area. If a particular BMC
|
||
|
|
has a large time gap between when the webserver is available and when all BMC
|
||
|
|
services have completed running, there is a window there that a user could
|
||
|
|
request a power on via the webserver when not all needed services are running.
|
||
|
|
|
||
|
|
## Background and References
|
||
|
|
|
||
|
|
The mailing list discussion can be found [here][1]. The BMC currently has three
|
||
|
|
major [state][2] management interfaces in a system. The BMC, Chassis, and Host.
|
||
|
|
Within each state interface, the current state and requested state are tracked.
|
||
|
|
|
||
|
|
The [BMC][3] state object is considered `Ready` once the systemd
|
||
|
|
`multi-user.target` has successfully started all if its services.
|
||
|
|
|
||
|
|
There are three options that have been discussed to solve this issue:
|
||
|
|
|
||
|
|
1. D-Bus objects don't exist until the backend is prepared to handle them.
|
||
|
|
2. If a user tries something that system is not in proper state to handle then
|
||
|
|
return an error code.
|
||
|
|
3. If a user tries something that system is not in proper state to handle then
|
||
|
|
queue it up.
|
||
|
|
|
||
|
|
Option 1 is challenging because D-Bus interfaces provided by OpenBMC state
|
||
|
|
applications have a mix of read-only properties (like current state) and
|
||
|
|
writeable properties that are used to request state changes. Not showing any
|
||
|
|
until everything is available could have unknown consequences. This also has
|
||
|
|
similar issues to option 2 in that applications and clients must have proper
|
||
|
|
code to handle missing interfaces.
|
||
|
|
|
||
|
|
Option 2 is challenging because Redfish clients and internal applications like
|
||
|
|
the op-panel code now need to properly handle error codes like this. You can
|
||
|
|
argue that they already should, but that is definitely not the case with a lot
|
||
|
|
of OpenBMC applications and clients.
|
||
|
|
|
||
|
|
Option 3 is the most user friendly option. No client or OpenBMC application
|
||
|
|
changes would be needed. One concern is that having a system somewhat randomly
|
||
|
|
power on at some later point in time could be unexpected. The general consensus
|
||
|
|
in this review though has been that this is the most preferred option.
|
||
|
|
|
||
|
|
[1]: https://lists.ozlabs.org/pipermail/openbmc/2022-April/030175.html
|
||
|
|
[2]:
|
||
|
|
https://github.com/openbmc/phosphor-dbus-interfaces/tree/master/yaml/xyz/openbmc_project/State
|
||
|
|
[3]:
|
||
|
|
https://github.com/openbmc/phosphor-dbus-interfaces/blob/master/yaml/xyz/openbmc_project/State/BMC.interface.yaml
|
||
|
|
|
||
|
|
## Requirements
|
||
|
|
|
||
|
|
- Queue up chassis and host requested state changes until the BMC is in the
|
||
|
|
proper state to allow the request
|
||
|
|
- What the "proper state" is will be implementation specific but by default
|
||
|
|
phosphor-state-manager will queue all requests until the BMC state has
|
||
|
|
reached `Ready`
|
||
|
|
|
||
|
|
## Proposed Design
|
||
|
|
|
||
|
|
If a power on or boot request is made to the Chassis or Host state objects and
|
||
|
|
the BMC is not at `Ready` then the request will be queued and the state
|
||
|
|
management code will begin monitoring for BMC `Ready`. Once reached, the
|
||
|
|
requested operation will be automatically executed.
|
||
|
|
|
||
|
|
## Alternatives Considered
|
||
|
|
|
||
|
|
The "Background and References" section covered some alternative options and the
|
||
|
|
complexity behind them.
|
||
|
|
|
||
|
|
Another option is to code the dependencies directly into the services. For
|
||
|
|
example, if the power on service requires the vrm vpd collection service, encode
|
||
|
|
that dependency in the systemd files. This is easy to say but in practice has
|
||
|
|
been challenging. Some OpenBMC services have built in assumptions that the
|
||
|
|
multi-user.target and all of it's dependent services have completed prior to a
|
||
|
|
power on being started. The general consensus within IBM was that it's much
|
||
|
|
easier and safer to just have a global wait-for-bmc-ready function as proposed
|
||
|
|
in this design.
|
||
|
|
|
||
|
|
## Impacts
|
||
|
|
|
||
|
|
Users will need to understand that their request to power on the system may be
|
||
|
|
delayed by an undefined amount of time. In general, a BMC gets to Ready state
|
||
|
|
within a couple of minutes.
|
||
|
|
|
||
|
|
### Organizational
|
||
|
|
|
||
|
|
This function will be implemented within the existing phosphor-state-manager
|
||
|
|
repository. x86-power-control, an alternative to phosphor-state-manager, could
|
||
|
|
also implement this logic.
|
||
|
|
|
||
|
|
## Testing
|
||
|
|
|
||
|
|
- Ensure a power on request is properly queued and executed when it is made
|
||
|
|
prior to the BMC being `Ready`.
|